Job Description
The elevated highway Inzersdorf is part of the A23, in the construction field are slopes and ramps. Due to the age and the heavy traffic load, the elevated highway is being renovated. This works we are support with comprehensive surveying services.
Basic facts
Construction sum: EUR 129 M
Construction period: 03/2015 – 12/2018