Job Description
We are commisioned for surveying and supervising a bridge construction in Belgrade. The new Sava Bridge will connect Neovi Belgrade with the city center. It is 929 meters long and the only pylon is 200 meters high.
Basic facts
Length: 929 m (1016 yd)
Construction sum: EUR 118 M
Construction period: 2008/07 – 2011/12