Job Description
34.8 miles, 58 bridges and six of them are viaducts, 4 resting areas and one motorway maintenance authority complex. Coordination of the entire surveying service what includes airborne surveying, creation of a fix point net, net densifications and high precision bridge networks.
· reference-point network
· recordings as planning guide
· coordination of entire surveying
· construction measurements
· contact to the IE
· aerial survey – progress documentation
Basic facts
Length: 65km
Construction sum: EUR 500 M
Construction period: 2008/07 – 2010/03